Monday’s bracket change starts at first-piece signoff

Quality

Published

3 Discussion

Revision C of the bracket inspection sheet takes effect at the start of day shift on Monday, November 23. Check the first-piece signoff to see which sheet a job takes. A job already signed off under B finishes on B. A job still waiting for signoff takes C.

The controlled sheet and the signed inspection record are in the quality system. Shift leads, please acknowledge this notice before you brief your crew.

Acknowledgement

This update requires your acknowledgement.

Try it—demo acknowledgements aren’t saved.

3 comments

Carl Ives

Our Sunday crew can finish setup before day shift comes in. If the first piece is still on the bench on Monday, are we on B or C?

Omar Keene

Author

C. Setup time doesn’t decide it. Look for the first-piece signoff. If it’s still unsigned when Monday’s day shift starts, use C.

Ana Foss

Good. When a tote marked B reaches packing on Tuesday, I’ll check the signoff before assuming the label is wrong.